Untitled Document
   
Untitled Document
 
Car Lift
Wheel Aligner
Wheel balancer
Tire Changer
Gas analyzer
Diesel smoke tester
ATF changer
Carbon cleaner/
Gasoline injecter
Battery tester & charger
Spotwelder
Refrigent recycler
Jack & pinpress etc
Fuel injection
pump tester etc
Lubrication equipment
Brake lathe
Vehicle diagnosis system
Generator
Air compressor
Car washing machine
Car mat cleaner
Reconditioning equipment
Diesel engine generator | Digital diesel generator | Welding generator |
Diesel generator | Sound proof generator | Alternators |
Gas tubine generator | Power plant engineering |    

 
   
 


Ultra-precision, simple and complete Gas Turbine Emergency Power Generation System

Ultra-precision, simple and complete Gas Turbine Emergency Power Generation System


GAS TURBINE

Gas turbine is capable of convertin the expansion of Combustion gas into direct rotary power. Both the gas turbine and system are simple, assuring 99.3% of staring reliability with the maximum output utilizing minimum space. This turbine also contributes to the protection of environment as it discharges colorless and low-pollution gas without causing vibration and keeps a quiet surroundings.

The highest reliability
- 99.3% of starting reliability is based on the simplicity of the turbine and system.
Substantial and light equipment.

- The maximum output is assured with the minimum space.
Good neighbor.

- The gas turbine keeps a quiet surroundings as it Exhaust Gas should be colorless and low-pollution without any vibration.

KG2-3C
KG2-3E
  Bass load Standby
Base load Standby

ISO(15) shaft output(kW)

1530
1890
1950
2250
Output speed(rpm) 1500/1800 1500/1800
1500/1800
1500/1800

Fuel type

Natural gas, diesel fuel or equal

Fuel flow, full load(MJ/sec)

9.32
10.96
11.42
12.76

Exhaust gas temperature(ɡ)

570
623
550
609

Exhaust mass flow(kg/sec)

12.8

13.5

15.0
15.0

Lude oil consumption(1/hr.)

0.03
0.03
0.03
0.03

Heat loss, lube oil, approx.(kW)

75 75 90
90
Heat loss, radiationl, approx.(kW) 30
35
35
40
Starting time to full load approx.(sec) 35-55 seconds depending on type of start system
Weight, turbine/gear(kg) 1750
1750
1830
1830

APPLICATIONS

- Computer Center
- Long distance communication centers.
- Hospital
- Banks-on line
- Air port terminals
- D/B(Office buildings
- Co -Generation system for regional heating
- Other emergency use.


*The manufacture reserves the right to change the product specifications without notice and liability.